Unit 3: Lean Workstructuring is the first of two units that introduces the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, instructor-led course describes the process of Lean Workstructuring. Following this course, you will be able to:
- Apply the methods and tools utilized in pull planning
- Describe the concept of Lean Workstructuring
- Outline the desired outcomes of Lean Workstructuring
- Describe the characteristics and application of the Last Planner® System